OAKS Solutions
Start a project →
{{ l.label }} Start a project →
OAKS SOLUTIONS · SINCE 2017

AI built for real-world impact.

We build and run AI systems for government, education and industry. From prototype to production, people stay in control.

Your data. A working prototype. Two weeks.

{{ p.v }}
{{ p.l }}
↓ SCROLL TO EXPLORE {{ heroCap }}

Figures from OAKS programme records. Sources and measurement periods on request.

ABOUT OAKS SOLUTIONS

AI engineering. Proven at scale.

Based in Hyderabad, OAKS builds AI for classrooms, public programmes and enterprise operations. Since 2017, our platforms have served 10 lakh+ users across five states.

We prototype in two weeks, deploy securely and stay accountable for performance.

FOUNDED2017
HEADQUARTERSHyderabad
FOOTPRINT5 states
CERTIFIEDISO 9001:2015
ISO/IEC 27001:2022
{{ abFx0 }}
VISION · LIVE
Computer visionReads trip cards, answer sheets and field imagery with measured accuracy.
{{ abFx1 }}
DOCUMENTS · LIVE
Document intelligenceTurns handwritten and paper records into structured data, traceable to the source.
{{ abFx2 }}
LEARNING · LIVE
Adaptive learningPersonalised learning paths and AI assessment, delivered at state scale.
{{ abFx3 }}
AGENTS · LIVE
Agentic workflowsAgents that gather evidence and draft actions for a person to approve.
02 / OUR SOLUTIONS · GOVERNMENT & EDUCATION

AI for education. Deployed statewide.

Adaptive learning, assessment and analytics help educators identify learning gaps and plan the next step.

{{ k.t }}
EIGHT SOLUTIONS · ACROSS INDIA {{ tabStatus }}
{{ g.short }} logo {{ g.cat }}
{{ g.pos }}

{{ g.title }}

{{ g.ctx }}

{{ s.cur }} {{ s.l }}
0:00 / 0:00
FROM THE FIELD
0:00 / 0:00
INTERACTIVE SIMULATION Open full screen ↗
WHAT WE DELIVERED
  • {{ x }}
{{ x.kc }} {{ x.v }}
TRUSTED BY {{ pt.name }}
WHAT WE CREATEFrom curriculum design to content production and digital deployment
{{ c.t }}
  • {{ x }}
DISTRICT BY DISTRICTOne report for each of Assam's 33 districts Samagra ShikshaGovernment of Assam
{{ asHoverName }} Sample report shownReport delivered
Select a district to view its report.
{{ asD.kicker }} {{ asD.name }}
50%Overall happiness index
{{ b.r }}
Needs immediate helpHappy and content
427students, Class 9–12 198secondary schools

All Class 9–12 students in the district’s secondary schools were invited to take part. The report was delivered to Samagra Shiksha Assam and the district Inspector of Schools. Baksa is shown here as a sample.

{{ asD.dimHead }}
{{ d.t }}{{ d.sub }} {{ d.lv }}
Read the Baksa sample report ↗
{{ x.v }}{{ x.l }}
IN PICTURES {{ g.whereNice }}
{{ p.alt }}
{{ p.cap }}
IN THE NEWS Select a clipping to read it
TESTIMONIALS · IN THEIR WORDSVoices from Project Titli
FROM THE FIELD
“{{ g.quote.text }}”
{{ g.quote.who }}

{{ g.note }}

03 / ENTERPRISE CASE STUDY

Production AI for complex operations.

Turn trip cards, maintenance logs and handover notes into clear insights. See where time is lost and what needs attention.

{{ k.t }}
CASE STUDY · ENTERPRISE KERANDARI, JHARKHAND · 200 VEHICLES
BGR Mining & Infra Limited

Trip Card Intelligence for a 200-vehicle coal mine.

A mine does not need another dashboard. It needs to know which vehicle lost time, where the delay began, and what the next shift should do differently.

{{ s.v }}
{{ s.l }}
THE PROBLEM
  • Handwritten trip cards, maintenance logs and shift records pile up after every shift
  • The same vehicle is logged under a different ID in each record
  • Teams spend hours reconstructing events instead of improving the operation
WHAT WE BUILT
  • Trip records extracted from handwritten cards
  • Vehicle IDs reconciled into one history per vehicle
  • Maintenance and shift data linked, with utilisation shown and the original record one click away
HOW IT WORKS ON SITE From a handwritten trip card to the next shift’s decision.
Illustrative isometric view of the Kerandari mine: open pit with excavator and haul trucks, haul road, workshop, fuel tanks and coal handling plant
STEP {{ bgrCur.n }} · {{ bgrCur.place }} {{ bgrCur.t }} {{ bgrCur.d }}
TRIP CARD Veh. HT 7 Load 4 — 6.42 Pit B → CHP
→
VehicleHT-07
Trip4
Out06:42
SourceOriginal card ↗
HT 7 · trip card Haul-07 · workshop T-007 · fuel log
ONE VEHICLE HT-07 3 records linked
HT-07 · ONE SHIFT
{{ e.t }} {{ e.what }}{{ e.src }}
UTILISATION BY SHIFTWorkingIdle
{{ b.k }}
Each idle block opens the trip card, log or handover note behind it.
Illustrative records, not client data.

Measured April–August 2026 against a January–March 2026 baseline, 200 vehicles. Figures confirmed in writing by BGR Mining & Infra.

See all case studies →
04 / WHAT WE ARE BUILDING NEXTNext-generation AI for grievance management, surveillance and operations.Agentic platforms for governments, police and operators — designed to prototype on your data in two weeks. Not yet client deployments.
ILLUSTRATIVE FOOTAGE
{{ rf.title }}{{ rf.lead }}
WHAT WE MEASURE
{{ k }}
01 · IN THE FIELD
{{ x.name }}{{ x.rec }}{{ x.flag }}
02 · OAKS AGENT
{{ a.n }}{{ a.k }}{{ a.t }}{{ a.d }}
{{ fdLive.tag }}{{ fdLive.t }}
03 · DECISION
HUMAN CHECKPOINT{{ fdHum.t }}
OUTCOME{{ fdOut.t }}
EVIDENCE{{ rf.ev }}
05 / HOW WE WORK

From problem to prototype in two weeks.

One team, from discovery to deployment and day-to-day operation.

{{ k.t }}
{{ ph.t }}{{ ph.d }}
{{ s.phT }}{{ s.phD }}
↺ What we learn in operation feeds the next round of discovery
STEP {{ mCur.n }} · {{ mCur.phase }} {{ mCur.t }} {{ mCur.d }}
Record→ReviewSTALLS→Decision
We map each handoff and find where decisions wait.
Data
Models
Infrastructure
Three layers, designed together — not in sequence.
Day 1Day 14 · working system ✓
Built on your real data, not a mock-up.
Before
In live use
Proven in real workflows, with the people who use it.
One site to many — same architecture, no rebuild.
Monitored continuously; retrained (amber) when accuracy drifts.
YOU GET {{ mCur.out }}
06 / WHY OAKS

Fast to prototype. Engineered to scale.

We understand your operation, build a working prototype and support it in production.

{{ w.n }}

{{ w.t }}

{{ w.d }}

→
07 / OUR FOOTPRINT

Five states. One experienced team.

Explore our programmes and results by state.

{{ k.t }}
OAKS DELIVERY FOOTPRINT Programme stateHyderabad HQ
{{ s.v }} {{ s.l }}
{{ p.name }}
Outline: MapSVG (@svg-maps/india), CC BY 4.0. Shows programme locations; not an administrative boundary reference.
{{ stCur.tag }} {{ stCur.name }}
{{ stCur.hv }} {{ stCur.hl }}
OUTCOMES · SELECT A PROJECT

Cumulative reach of OAKS programmes since 2017.

08 / OUR PARTNERS · EMPANELMENTS

Trusted by governments and institutions.

EMPANELLED WITH
QCI · BECIL · EdCIL · NCERT
CLIENTS AND PROGRAMME PARTNERS State governments, industry and research.
{{ partnerCount }} organisations since 2017
{{ grp.t }} {{ grp.d }}
{{ p.name }} {{ p.name }}

Your next step: a working prototype.

For Government & Education

TELL US
  1. 1The programme and its goals
  2. 2The outcomes you are accountable for
  3. 3The data you already collect

Start with a two-week pilot in schools or a single district.

Request a programme briefing →

For Enterprise Operations

TELL US
  1. 1What slows the operation down
  2. 2Which decisions need to improve
  3. 3The records you already keep

Start with a two-week prototype on your data.

Talk to an architect →
{{ clip.outlet }} clipping
{{ clip.what }}{{ clip.outlet }} · {{ clip.date }}
{{ cred.name }}

{{ r }}

{{ cred.tbc }}
{{ formSubject }} Start a project
Thank you. We will reply within two working days.
{{ formErr }}
Sorry, your message could not be sent. Please try again, or email info@oaks.guru or call +91 72076 33633.
{{ sendLabel }}